What is the length of transmission line running between Matiari and Lahore under the umbrella of CPEC?

A. 500 kilovolt (kV)
B. 600 kilovolt (kV)
C. 800 kilovolt (kV)
D. None of these

Explanation:

Evacuation of Power from Coal-based Plants located at Thar, Port Qasim and Hub. 4000 MW ±660 kV HVDC Line Matiari-Lahore, 878km.

Recent Posts

[Current Affairs] 24th May, 2022 Top Pakistan Current Affairs for PPSC Test Preparation

Today’s top Pakistan current affairs  24th May 2022 with download link available in pdf. These…

4 years ago

[Current Affairs] 23rd May, 2022 Top Pakistan Current Affairs for PPSC Test Preparation

Today’s top Pakistan current affairs  23rd May 2022 with download link available in pdf. These…

4 years ago

[Current Affairs] 20 May, 2022 Top Pakistan Current Affairs for PPSC Test Preparation

Today’s top Pakistan current affairs  20 May 2022 with download link available in pdf. These…

4 years ago

[Current Affairs] 19th May, 2022 Top Pakistan Current Affairs for PPSC Test Preparation

Today’s top Pakistan current affairs  19th May 2022 with download link available in pdf. These…

4 years ago

[Current Affairs] 9th May, 2022 Top Pakistan Current Affairs for PPSC Test Preparation

Today’s top Pakistan current affairs  9th May 2022 with download link available in pdf. These…

4 years ago

[Current Affairs] 7th May, 2022 Top Pakistan Current Affairs for PPSC Test Preparation

Today’s top Pakistan current affairs  7th May 2022 with download link available in pdf. These…

4 years ago