197

A. 500 kilovolt (kV)
B. 600 kilovolt (kV)
C. 800 kilovolt (kV)
D. None of these

Explanation:

Evacuation of Power from Coal-based Plants located at Thar, Port Qasim and Hub. 4000 MW ±660 kV HVDC Line Matiari-Lahore, 878km.