What is the length of transmission line running between Matiari and Lahore under the umbrella of CPEC?

201

A. 500 kilovolt (kV)
B. 600 kilovolt (kV)
C. 800 kilovolt (kV)
D. None of these

Explanation:

Evacuation of Power from Coal-based Plants located at Thar, Port Qasim and Hub. 4000 MW ±660 kV HVDC Line Matiari-Lahore, 878km.