How many Green Line Buses will cover a track of 21 km in Karachi?

A. 70
B. 75
C. 80
D. 85

Explanation:

The 21 km (13.0 mi) busway is the first phase of the Karachi Metrobus network and has 22 stations (a station after every km). The greenline was expected to be functional by November 2021 and to have a fleet of 80 buses operated by Daewoo.

Recent Posts

[Current Affairs] 24th May, 2022 Top Pakistan Current Affairs for PPSC Test Preparation

Today’s top Pakistan current affairs  24th May 2022 with download link available in pdf. These…

4 years ago

[Current Affairs] 23rd May, 2022 Top Pakistan Current Affairs for PPSC Test Preparation

Today’s top Pakistan current affairs  23rd May 2022 with download link available in pdf. These…

4 years ago

[Current Affairs] 20 May, 2022 Top Pakistan Current Affairs for PPSC Test Preparation

Today’s top Pakistan current affairs  20 May 2022 with download link available in pdf. These…

4 years ago

[Current Affairs] 19th May, 2022 Top Pakistan Current Affairs for PPSC Test Preparation

Today’s top Pakistan current affairs  19th May 2022 with download link available in pdf. These…

4 years ago

[Current Affairs] 9th May, 2022 Top Pakistan Current Affairs for PPSC Test Preparation

Today’s top Pakistan current affairs  9th May 2022 with download link available in pdf. These…

4 years ago

[Current Affairs] 7th May, 2022 Top Pakistan Current Affairs for PPSC Test Preparation

Today’s top Pakistan current affairs  7th May 2022 with download link available in pdf. These…

4 years ago