How many Green Line Buses will cover a track of 21 km in Karachi?

182

A. 70
B. 75
C. 80
D. 85

Explanation:

The 21 km (13.0 mi) busway is the first phase of the Karachi Metrobus network and has 22 stations (a station after every km). The greenline was expected to be functional by November 2021 and to have a fleet of 80 buses operated by Daewoo.